logo milco
X MENU
panamericanos Institucional

LIMA 2019: NEW CALLAO SPORTS CENTER WILL HAVE AN INFRASTRUCTURE BASED ON CALLAO'S CULTURE

Callao Sports Center will host women’s and men’s volleyball, sitting volleyball and Para taekwondo.

Redacción - Lima 2019

LIMA 2019: NEW CALLAO SPORTS CENTER WILL HAVE AN INFRASTRUCTURE BASED ON CALLAO'S CULTURE

The new Callao Sports Center, located in the Regional Sports Village, will be the first competition stage in the country with an infrastructure based on Callao's culture.

The main ceiling and general structure of this sports stage, venue of the Lima 2019 Pan American and Parapan American Games, were designed based on the shapes of the first port and old houses in Callao, as well as on the sea waves.

The modern Sports Center will have a capacity for up to 6 100 people and will remain as one of the Lima 2019 main legacies. Also, it will transform Callao in a significant hub for sports development in Peru.

“Currently, this work has reached a 85% of its total. We’re meeting all the deadlines. We made a promise to the coach of the women’s volleyball team, Francisco Hervás, that his team would be able to train here from April 1,” stated Engineer Wilhelm Funcke, Lima 2019 Project and Infrastructure Manager.

Competitions

For Lima 2019, this great sports infrastructure will host men and women volleyball and taekwondo tournaments, as well as sitting volleyball and Para taekwondo competitions for the Parapan American Games.  Also, this Sports Center will have a main field and a warm-up area with two fields.

“We have already started placing the floating field, which may reduce athletes’ injuries,” said the official.

Work progress

Works continue at a good pace, complying with the schedule. To date, the ceiling will be totally covered after placing the metal structure in the main and auxiliary field of the Sports Center. Access ramps for the stands are almost finished. This zone has reached a 85% of work progress.

Also, bathrooms, dressing rooms and floors are being finished, firefighting water and the sewer system of these areas have been installed, as well as the polished floor in main traffic areas.  Roll-up doors and elevators for the four stands will be installed later. These have reached 90% of work progress.

Work completion and specifications

The Callao Sports Center will have a roof structure of 95 m of clearance between columns, and floating sports floor of around 4 300 m2 for professional volleyball.

It will also have retractable grandstands. It should be noted that we are using the highest technology to build a world-class scenario like this.

This new Sports Center, including outdoor spaces, is expected to be ready by March 31, 2019.


The most read

1 LIMA 2019’S OFFICIAL SONG WILL BE COMPOSED BY PEDRO SUAREZ VERTIZ
LIMA 2019’S OFFICIAL SONG WILL BE COMPOSED BY PEDRO SUAREZ VERTIZ
Lima, April 04, 2019
The singer encouraged Peruvians to be great hosts during the most important sports event in the Americas.
2 LIMA 2019 INVITES ARTISTS TO BE PART OF ITS CULTURAL PROGRAM
LIMA 2019 INVITES ARTISTS TO BE PART OF ITS CULTURAL PROGRAM
Lima, April 09, 2019
All interested people can register and apply online from April 10 to May 27.
3 PANAM SPORTS AND LIMA 2019 MEET THE PRIME MINISTER TODAY
PANAM SPORTS AND LIMA 2019 MEET THE PRIME MINISTER TODAY
Lima, April 09, 2019
Neven Ilic and Carlos Neuhaus had a meeting today with Salvador del Solar, and they ratified the government commitments to Lima 2019.
4 LIMA 2019 PRESENTS THE OFFICIAL UNIFORMS FOR THE LIMA 2019 GAMES
LIMA 2019 PRESENTS THE OFFICIAL UNIFORMS FOR THE LIMA 2019 GAMES
Lima, April 11, 2019
Micro and small business part of MYPErú purschase program will be in charge of uniforms.
5 LUIS FONSI TO SING AT LIMA 2019 OPENING CEREMONY
LUIS FONSI TO SING AT LIMA 2019 OPENING CEREMONY
Lima, June 06, 2019
The winner of five Latin GRAMMY® awards will be in charge of closing the Pan American Games Opening Ceremony next July 26 at the National Stadium of L
6 LIMA 2019 UNIFORM AND ACCREDITATION CENTER STARTED OPERATIONS
LIMA 2019 UNIFORM AND ACCREDITATION CENTER STARTED OPERATIONS
Lima, June 13, 2019
The venue located at the Jockey Club is the first to be activated for the Lima 2019 Pan American and Parapan American Games.
7 FENCING AND ITS GOAL FOR LIMA 2019: TO WIN THE GOLD
FENCING AND ITS GOAL FOR LIMA 2019: TO WIN THE GOLD
Lima, June 14, 2019
This sport will be held at the Lima Convention Center.
8 PERUVIAN CYCLISTS IN FINAL STRETCH FOR LIMA 2019
PERUVIAN CYCLISTS IN FINAL STRETCH FOR LIMA 2019
Lima, June 14, 2019
The Peruvian track cycling team is currently training at the remodeled Velodrome at the VIDENA. They all hope to win a place on the sprint podium.
9 PERUVIAN NATIONAL POLICE PERFORMS SECOND LIMA 2019 LANE TEST IN CALLAO
PERUVIAN NATIONAL POLICE PERFORMS SECOND LIMA 2019 LANE TEST IN CALLAO
Lima, June 14, 2019
The segregated lane covered the route from the Peruvian Naval Academy Satellite Village to the Callao Regional Sports Village.
10 LIMA 2019 PRESENTS PAN AMERICAN AND PARAPAN AMERICAN TORCHES
LIMA 2019 PRESENTS PAN AMERICAN AND PARAPAN AMERICAN TORCHES
Lima, June 28, 2019
The Pan American Torch Route will last 22 days and will pass through 26 cities of the coast, highlands and jungle of Peru.
11 THE LIMA 2019 OFFICIAL MEDALS MADE WITH 100 PERCENT PERUVIAN METALS
THE LIMA 2019 OFFICIAL MEDALS MADE WITH 100 PERCENT PERUVIAN METALS
Lima, July 11, 2019
Nearly 5000 medals will be awarded to the winners of the Pan American and Parapan American Games.