The execution of the sports infrastructure projects corresponding to the XVIII Pan American and Parapan Am Games Lima 2019 advance in their total dimension within the established deadlines. This is the case of the Villa Deportiva Regional del Callao, where the new Sports Center is built which will be thef women's and men's volleyball, Taekwondo, as well as Para Taekwondo and Volleyball sitting Venue during the Lima 2019 Games.
This new Sports Center will become one of the great legacies that will leave the Lima 2019 Games and will make Callao an important place of sports development in the country. It will have a capacity for more than 6 thousand people.
This Venue construction is using the highest technology that requires a high level stage, as it will be this Sports Center, which will have a spatial structure ceiling of 95 meters of free separation between columns, floating sports floor of around 4300 m2 for Volleyball. Also, it will have retractable tribunes inside.
You can also see important progress in the execution of this work, in regard to the construction of four fixed tribunes, the shuttering of the columns, the emptying of concrete in beams and columns, the installation of beams and prefabricated stands roofs and the first floor of the sports arena.
Work has been done on the shuttering of the spaces in each platform for the installation of four elevators, as well as those related to the construction of masonry walls and concrete floors, courts for heating, access to the grandstands, the main door and ramps of access to the sports scenario.